Photovoltaic system installation step by step

From the first consultation to grid approval: Techede plans and coordinates your solar system cleanly, safely and understandably.

Go straight to the right photovoltaic solution. Send a short enquiry, have your project assessed and see the next steps clearly.

Installation process

Good installation starts long before the first module.

A professional installation process connects consultation, solar analysis, tailored planning, permits, professional installation, grid connection, inspection and monitoring. Techede turns this into clear project management so you always know what is happening and what comes next.

01

Consultation with roof analysis

We check consumption, roof area, orientation, shading and goals before an offer is created.

02

Planning and permits

Modules, inverter, storage, cable routes and necessary clarifications are prepared cleanly.

03

Installation and grid connection

Installation is coordinated, checked and handed over so you can use the system safely.

Photovoltaic planning and installation

Structured process

From roof potential to a running solar system.

Installing a photovoltaic system touches roof, electrical work, safety, grid operator and documentation. The decisive factor is therefore not only installation, but a process that connects analysis, planning, permits, execution and commissioning.

  • Initial consultation with consumption and goal clarification
  • Check solar potential, shading and roof condition
  • Tailored planning with components and cable routing
  • Installation, grid connection, inspection and introduction
Check project for free

Process

The installation process at Techede.

1

Initial consultation

We clarify electricity bill, building, goals and possible extensions such as storage or charging station.

2

Technical planning

Orientation, inclination, load, shading and expected production are translated into a clear system concept.

3

Permits & preparation

Documents, material, appointments and necessary coordination are prepared before installation.

4

Installation & handover

Modules, inverter and connection are installed, checked and handed over with understandable monitoring.

FAQ

Frequently asked questions about this topic.

How long does installation take?

The installation itself can often be completed in a few days depending on size. The overall schedule depends on planning, material, permits and grid clarification.

Who handles permits and grid connection?

Techede coordinates the necessary steps and aligns technical points with the responsible parties.

Will I receive an introduction after installation?

Yes. After commissioning, we explain the system, monitoring and the key points for ongoing operation.